Home > HP ASE > HP0-725

HP0-725

HP Certified Professional Implementing Enterprise Integration and Management of HP ProLiant Servers
exam #HP0-725
Exam Preparation Guide

Purpose of the Exam Preparation Guide

The intent of this guide is to set expectations about the content and the context
of the exam and to help candidates prepare for the exam. In this guide, you will find recommended HP training courses, reference and study material, and sample test items to help you achieve a passing score.

Studies conducted by HP and Prometric show that a combination of course attendance and self-study maximizes the likelihood of passing the exam on the first attempt.

Audience

This exam is for system engineers or technicians who require an in-depth understanding of the technologies deployed in HP ProLiant servers and computer professionals pursuing an HP Accredited Systems Engineer (ASE) certification.

Certification requirements

This exam, Enterprise Integration and Management of HP ProLiant Servers, HP0-725 is one of the core requirements to be certified as an Accredited Systems Engineer (ASE.)

This level of certification measures the competencies required for hands-on planning and the integration and support of technical solutions in business class, networked environments. Given a set of customer business requirements, this individual is expected to be able to design, support and
integrate platform, operating system, storage, network and option components
to solve business needs. The ideal candidate is anyone who deploys enterprise class solutions based on HP technologies.

Prerequisites

HP strongly recommends that students taking this course have the following credentials. (The instructor will deliver this course under the assumption that students have attained this level of experience.)

 AIS certification (Implementing HP ProLiant servers, HP0- 645)

 Three years experience configuring and installing server products

Rev. 4.21 1

Enterprise Integration and Management of HP ProLiant Servers (HPO-725)

Exam details

At the beginning of the exam, you will be asked to answer several survey questions. The survey has been designed to help the exam development team define the final exam forms and set the passing score. Your honest responses will assist the exam team in properly tailoring this exam to the appropriate audience.

Details about the exam include:

• Number of items 107
• Item types
Multiple choice, Drag and Drop, and Click the Exhibit
Button


Time commitment
135 minutes


Passing Score
74%


Reference material
No oonline rapidshare 4shared links or hardcopy reference material will be
allowed at the testing site.

Comments on the exam

During the exam, participants are encouraged to make specific comments about the items on the exam (please include comments about accuracy and appropriateness of these items to the audience). HP welcomes these comments as part of its continuous improvement process.

Exam content

The following testing objectives represent the specific areas of content covered
in the exam. Use this outline to guide your study and to check your readiness for the exam. The exam measures your understanding of these areas.

Enterprise Integration and Management of HP ProLiant Servers

(HP0- 725) Exam Content

1.0 Explain and recognize fundamental server technologies

1.1 Explain and recognize processor technologies

1.2 Explain and recognize memory technologies

1.3 Explain and recognize I/O bus technologies

1.4 Explain and recognize storage technologies

1.5 Explain network technologies

1.6 Explain and recognize system architectures

1.7 Explain and recognize power/thermal and hardware management technologies

1.8 Explain availability and cluster technologies
2 Rev. 4.21

Enterprise Integration and Management of HP ProLiant Servers (HPO-725)

1.9 Describe the partner products and how to categorize them

1.10 Explain operating system architectures

1.11 Classify and describe server applications and their profiles

1.12 Explain mission-critical concepts and environmental requirements

1.13 Systems Management Fundamentals and Technologies

Recognize and describe HP industry-standard server products

3.0 Perform the planning and design necessary to achieve a deployable solution

3.1 Gather data

3.2 Use HP configuration tools to validate the design

3.3 Design the correct customer server solution

3.4 Write a scope of work

3.5 Obtain customer buy-off

3.6 Gather necessary tools and resources

3.7 Perform a proof of concept

4.0 Install, configure, set up, and upgrade systems and options

4.1 Install and configure storage

4.2 Identify StorageWorks key differentiators

4.3 Summarize the ENSA features and components to support the
StorageWorks concept of storage as a utility

4.4 Install and configure hardware

4.5 Install the operating system by using SmartStart

4.6 Install and configure the management agents

4.7 Configure the operating system networking services

4.8 Configure fault-tolerant options

4.9 Install the operating system by using a multi-server deployment tool

4.10 Explain, install, and configure clustering

4.11 Describe rack and power/infrastructure options

4.12 Validate and test the system and storage installations

4.13 Use the Survey/Insight Utility to document the solution

Performance-tune and optimize a solution

6.0 Perform troubleshooting of server and storage problems

6.1 Describe and apply the six-step methodology

6.2 Collect data using system and storage tools

Rev. 4.21 3

Enterprise Integration and Management of HP ProLiant Servers (HPO-725)

6.3 Evaluate data to determine the problem

6.4 Develop an optimized action plan

6.5 Execute the plan

6.8 Implement preventative measures, taking necessary steps to ensure the problem is not reoccurring

6.9 Use fault management

6.10 Use OnSite Agents Reference Set (OARS)

6.14 Identify and describe HP service capabilities

6.15 Install service delivery tools

6.16 Use service delivery tools (Support CDs, OnSite Agents Reference
Set (OARS), and HP PartSurfer)

7.1 Use HP management and serviceability tools and resources

7.1 Identify the performance management process

7.2 Use performance management tools

7.3 Record baseline measurements

7.4 Resolve performance bottlenecks

7.5 Document changes, results, and recommendations

7.6 Perform volume management

7.7 Identify common performance issues

7.8 Set performance thresholds

8.0 Perform administrative and operational tasks

8.1 Install and configure the Version Control Repository Manager
(VCRM) and Version Control Agent (VCA)

8.2 Use change/configuration management tools

8.3 Perform system upgrades

8.4 Explain security requirements

8.5 Perform security administration

8.6 Resolve a virus problem

8.7 Perform backups

4 Rev. 4.21

Enterprise Integration and Management of HP ProLiant Servers (HPO-725)

Recommended Training and Study References

This section lists training courses and documents that can help you acquire a majority of the knowledge and skills needed to pass the exam. You must also gain the practical experience outlined in this guide.

You are not required to take the courses listed in this section. However, HP strongly recommends that you attend the classes, participate in class labs, and thoroughly review all course material and documents before taking the exam, even if you believe you have sufficient on-the-job experience.

 ProLiant ASE certification course ‘Enterprise Integration and
Management of HP ProLiant Servers’

 ProLiant AIS certification course ‘Implementing HP ProLiant servers’

 HP ProLiant Servers AIS Study Guide, ISBN 0-13-146717-4

Rev. 4.21 5

Enterprise Integration and Management of HP ProLiant Servers (HPO-725)

Sample test items

The following sample test items give you a preview of what the actual test
items will look like. These items will not be on the exam itself. However, they
are representative of the actual items, and they should help you become familiar with the format and complexity of the test items. These sample test items are not a check for readiness.

1. Which type of network addressing should be used when deploying several servers configured with ProLiant Essentials Rapid Deployment Pack (RDP)?
A. unicast

B. multicast C. broadcast D. TCP/IP

2. What is the correct procedure when performing a customer needs analysis? A. identify and analyzing previous purchasing trends
B. conduct an interview process and site survey

C. use Insight Manager to determine the number of existing servers

D. analyze the customer’s existing network infrastructure

3. Which of these is a sizing and planning tool available from HP? A. Custom Builder
B. Insight Manager

C. SecurePath Manager

D. Rapid Deployment Pack

4. Which LINUX program allows a Windows client to access shared files on the
LINUX system using Server Message Blocks (SMB)? A. FTP
B. HTTP C. NFS
D. SAMBA

6 Rev. 4.21

Enterprise Integration and Management of HP ProLiant Servers (HPO-725)

5. Which program allows a Linux server to integrate DNS with Microsoft Active
Directory?

A. UltraDNS B. QuickDNS C. BIND 9.X D. BIND 8.X

6. Using HP Rapid Deployment Pack (RDP) to perform a scripted installation of
Windows Server 2003, which file should be modified so that the server will join a domain during the installation?

A. w2k.txt

B. wnet.txt

C. unattended.txt

D. ks.cfg

7. Which command must be used to integrate third party MIBs with HP Systems
Insight Manager? A. mcompile.bat B. mimport.bat C. mregister.bat D. mlink.bat

8. Which tool should be used to integrate HP ProLiant servers with management platforms?

A. Insight Manager 7

B. Rapid Deployment Pack (RDP)

C. Integration scripts from the Management CD D. Management Information Base (MIB) toolkit

9. HP Management agents were properly installed in a Linux server, but you are unable to gain access. Why are you unable to access this server?

A. /etc/snmp/snmpd.conf is misconfigured B. /etc/snmp/snmp.conf is misconfigured C. /etc/named.conf is misconfigured
D. /var/www/httpd.conf is misconfigured

Rev. 4.21 7

Enterprise Integration and Management of HP ProLiant Servers (HPO-725)

10. Which management tools are capable of managing DMI-compliant devices in
an existing HP ProLiant Server network? Select TWO. A. Survey
B. QuickFind

C. ActiveAnswers

D. HP Systems Insight Manager

E. HP OpenView Network Node Manager

11. What are configurable components in a network environment that contribute
to establishing a comprehensive security policy? Select TWO. A. RAID
B. cluster

C. firewall

D. operating system

12. Which HP server tool can document installation of Microsoft Windows security patches on an HP ProLiant server?

A. Sales Builder

B. Survey Utility

C. Version Control Manager

D. Integrated Management Log

13. When troubleshooting HP Systems Insight Manager (SIM) which trust mode should be selected on the HP Management Agent?

A. Trust by Name

B. Trust All

C. Trust Everyone

D. Trust by Certificate

14. Upon installing HP Systems Insight Manager on an HP ProLiant server, which
is running Microsoft Windows Server 2003, you find that the HP Systems Insight Manager cannot collect and classify information about the enterprise ProLiant servers from the Management Agents. What went wrong to cause this failure? Select TWO.

A. The HP Systems Insight Manager Discovery Filters are not enabled by default to locate Server and Management Processor devices.
B. The HP Systems Insight Manager database is not installed correctly. C. The default security setting allows SNMP requests from the local host
system only.

D. The HP Systems Insight Manager server is not set to the same community string as the Windows Server 2003 server.

E. The Health and Management Agents are not installed on the server.
8 Rev. 4.21

Enterprise Integration and Management of HP ProLiant Servers (HPO-725)

15. Which ProLiant Essentials Foundation Pack tool should be used to optimize
the consolidation of multiple applications onto one SMP server? A. Performance Management Pack
B. Workload Management Pack

C. Recovery Server Option Pack

D. Rapid Deployment Pack

E. Integrated Lights-Out Advanced Pack

16. How are ProLiant Essentials Performance Management Pack (PMP) licenses used?

A. They are bound to specific monitored servers

B. They are transferable from one monitored server to another. C. They can float among monitored servers.
D. They can be removed from any monitored server.

17. Before creating a partition using Resource Partitioning Manager what preliminary information is required?

A. IP address, network mask, and gateway

B. server name, share name, and IP address

C. disk partition name, minimum disk space to reserve, and maximum allowed disk space

D. partition name, amount of memory, and selected processors

18. Which statements are correct when analyzing performance data? A. When analyzing the results, watch for unusually low values.
B. When analyzing the results, compare results to other servers in the
enterprise environment.
C. When establishing a baseline, it is important to know the type of work being performed and when this work occurs.
D. When analyzing the results, investigate the occasional spikes.
E. The established baseline should include the counter values you would expect to see when the system performance is satisfactory.

19. Which HP tool enables the detection of a saturated disk subsystem as a bottleneck in a database server?
A. Array Configuration Utility (ACU)
B. Performance Management Pack (PMP) C. Windows Task Manager (WTM)
D. Workload Management Pack (WMP)

20. What is the Linux command to determine available memory on a RedHat
Advanced Server 3.0? A. cat /proc/info
B. cat /proc/meminfo
C. cat /proc/memsys
D. cat /proc/memsys

Rev. 4.21 9

Enterprise Integration and Management of HP ProLiant Servers (HPO-725)

21. Which technology enables building a multiserver solution that requires a
centrally managed, highly available, scalable storage infrastructure? A. Distributed File System (DFS)
B. Storage Area Network (SAN) C. Network File System (NFS)
D. Direct Attached Storage (DAS)

22. Which solution would be the best protection to keep a business from extended downtime and data loss should a catastrophic event occur?
A. mirroring the data using hardware RAID 1
B. duplexing the data using a second SCSI controller
C. remotely replicating the data across a SAN or WAN to a second site
D. storing backup tapes at a remote site

23. Which components should be configured as part of a fully redundant solution using an MSA1000? Select THREE.
A. Secure Path
B. Virtual Replicator
C. A second controller
D. A second power supply
E. An environmental monitoring unit
F. Fibre Channel I/O module

24. Which components are required when designing a highly available HP
ProLiant server solution running Windows 2000 Advanced Server and using a
SAN-based shared storage? Select THREE A. storage provisioning software
B. Storage Management Appliance
C. Fabric Watch software
D. a redundant fabric infrastructure
E. multiple Fibre Channel ports per server
F. disaster recovery software
G. multipath software

25. A key capability of the ENSA extended architecture is defined as _______. A. partitioning of storage
B. storage security
C. replication of storage
D. manual-configuration of new storage

26. How does a cluster configuration achieve high availability?
A. by managing and tolerating failures of separate components
B. by allowing a failed card to be replaced without having to quiesce applications
C. by enabling the server to continue to receive power even if one power supply should fail
D. by preventing single-bit memory errors from propagating into double-bit
memory failures

Free hp Sample Printable PDF VCE Download: PassGuide offers free demo for HP certification Exams You can check out the interface, question quality and usability of our IT Simulation exams before you decide to buy it. We are the only one site can offer demo for almost all products.

27. What is the function of a dual ceiling plenum design in a datacenter? A. to force cold air from the ceiling
B. to force hot air through the floor
C. to remove more hot air through the ceiling
D. to reduce the number of Air Condition units

10 Rev. 4.21

Enterprise Integration and Management of HP ProLiant Servers (HPO-725)

28. What is the proper direction of forced airflow for ProLiant Server rack
configurations?
A. Cool air is drawn through the front door and warm air is expelled through the rear door.
B.Cool air is drawn through the rear door and warm air is expelled through
the front door.
C.Cool air is drawn through the top of the rack and warm air is expelled through the bottom of the rack.
D.Cool air is drawn through the bottom of the rack and warm air is expelled
through the top of the rack.

29. How should rows of racks within a data center be positioned?
A. front to back to equalized temperatures throughout the data center
B. back to back and front to front to provide alternating rows of warm and cool air
C. towards the center of the data center to provide adequate heat
dissipation from centralized AC systems
D. towards the outside of the data center to provide adequate heat dissipation for centralized AC systems

30. How does Super DLT technology help to significantly reduce administrative cost in a backup solution designed for unattended backups?
A. It has the high capacity and reliability of DLT drives to back up servers up to 50GB without compression with greater data transfer rates than the 35/70GB DLT drive. Super DLT drives are an attractive upgrade
from high-end DAT drives and a good alternative to DLT for lower-cost solutions.
B. It uses simultaneous multichannel and multihead read/write technology
to achieve capacities up to 40GB without compression.
C. It is the appropriate choice for servers with 4GB to 20GB capacity without compression.
D. It offers backward-compatibility with DLT tapes and increases storage capacity and data transfer rates by an order of magnitude; storage capacity starts at 110GB without compression.

31. What information is required to determine if a backup solution can perform a data backup within a specific time-span? Select THREE.
A. The specifications of the HP tape technology being considered for the solution
B. The total number of tapes required for the backup
C. The total amount of data to be backed up
D. The total number of tape drives required for the backup
E. The time frame of the backup window
F. The tape backup software that will be used

32. Double-conversion (“oonline rapidshare 4shared links”) UPS technology is based on converting
_______.
A. Incoming AC power to battery DC power to conditioned outgoing AC
power
B. Apparent power (VA) to true power (W) and back again
C. Incoming 440/480VAC to 220/240VAC for servers and 110/120VAC for workstations
D. Automotive 12VDC to 110/120VAC for a laptop

Rev. 4.21 11

Enterprise Integration and Management of HP ProLiant Servers (HPO-725)

33. How many steps does the HP troubleshooting methodology consists of?
A. 5
B .6
C .8
D. 12

Conclusion

HP wishes you success in the HP Certified Professional Program and in passing the exam for which you are preparing.

12 Rev. 4.21

Enterprise Integration and Management of HP ProLiant Servers (HPO-725)

Answer Key

1. Which type of network addressing should be used when deploying several servers configured with ProLiant Essentials Rapid Deployment Pack (RDP)?
A. unicast

* B. multicast C. broadcast D. TCP/IP

2. What is the correct procedure when performing a customer needs analysis? A. identify and analyzing previous purchasing trends
* B. conduct an interview process and site survey

C. use Insight Manager to determine the number of existing servers

D. analyze the customer’s existing network infrastructure

3. Which of these is a sizing and planning tool available from HP?

* A. Custom Builder

B. Insight Manager

C. SecurePath Manager

D. Rapid Deployment Pac

4. Which LINUX program allows a Windows client to access shared files on the
LINUX system using Server Message Blocks (SMB)? A. FTP
B. HTTP C. NFS
* D. SAMBA

5. Which program allows a Linux server to integrate DNS with Microsoft Active
Directory?

A. UltraDNS B. QuickDNS
* C. BIND 9.X D. BIND 8.X

Rev. 4.21 13

Enterprise Integration and Management of HP ProLiant Servers (HPO-725)

6. Using HP Rapid Deployment Pack (RDP) to perform a scripted installation of
Windows Server 2003, which file should be modified so that the server will join a domain during the installation?

A. w2k.txt

* B. wnet.txt

C. unattended.txt

D. ks.cfg

7. Which command must be used to integrate third party MIBs with HP Systems Insight Manager?

* A. mcompile.bat B. mimport.bat C. mregister.bat D. mlink.bat

8. Which tool should be used to integrate HP ProLiant servers with management platforms?

A. Insight Manager 7

B. Rapid Deployment Pack (RDP)

C. Integration scripts from the Management CD

* D. Management Information Base (MIB) toolkit

9. HP Management agents were properly installed in a Linux server, but you are unable to gain access. Why are you unable to access this server?

* A. /etc/snmp/snmpd.conf is misconfigured

B. /etc/snmp/snmp.conf is misconfigured

C. /etc/named.conf is misconfigured

D. /var/www/httpd.conf is misconfigured

10. Which management tools are capable of managing DMI-compliant devices in an existing HP ProLiant Server network? Select TWO.

A. Survey

B. QuickFind

C. ActiveAnswers

* D. HP Systems Insight Manager

* E. HP OpenView Network Node Manager

14 Rev. 4.21

Enterprise Integration and Management of HP ProLiant Servers (HPO-725)

11. What are configurable components in a network environment that contribute
to establishing a comprehensive security policy? Select TWO. A. RAID
B. cluster

* C. firewall

* D. operating system

12. Which HP server tool can document installation of Microsoft Windows security patches on an HP ProLiant server?

A. Sales Builder

* B. Survey Utility

C. Version Control Manager

D. Integrated Management Log

13. When troubleshooting HP Systems Insight Manager (SIM) which trust mode should be selected on the HP Management Agent?

A. Trust by Name

* B. Trust All

C. Trust Everyone

D. Trust by Certificate

14. Upon installing HP Systems Insight Manager on an HP ProLiant server, which
is running Microsoft Windows Server 2003, you find that the HP Systems Insight Manager cannot collect and classify information about the enterprise ProLiant servers from the Management Agents. What went wrong to cause this failure? Select TWO.

A. The HP Systems Insight Manager Discovery Filters are not enabled by default to locate Server and Management Processor devices.

B. The HP Systems Insight Manager database is not installed correctly.

* C. The default security setting allows SNMP requests from the local host system only.

* D. The HP Systems Insight Manager server is not set to the same community string as the Windows Server 2003 server.

E. The Health and Management Agents are not installed on the server.

15. Which ProLiant Essentials Foundation Pack tool should be used to optimize the consolidation of multiple applications onto one SMP server?

A. Performance Management Pack

* B. Workload Management Pack C. Recovery Server Option Pack D. Rapid Deployment Pack
E. Integrated Lights-Out Advanced Pack
Rev. 4.21 15

Enterprise Integration and Management of HP ProLiant Servers (HPO-725)

16. How are ProLiant Essentials Performance Management Pack (PMP) licenses
used?

* A. They are bound to specific monitored servers.

B. They are transferable from one monitored server to another. C. They can float among monitored servers.
D. They can be removed from any monitored server.

17. Before creating a partition using Resource Partitioning Manager what preliminary information is required?

A. IP address, network mask, and gateway

B. server name, share name, and IP address

C. disk partition name, minimum disk space to reserve, and maximum allowed disk space

* D. partition name, amount of memory, and selected processors

18. Which statements are correct when analyzing performance data? Select
TWO.
A. When analyzing the results, watch for unusually low values.
B. When analyzing the results, compare results to other servers in the enterprise environment.
* C. When establishing a baseline, it is important to know the type of work
being performed and when this work occurs.
D. When analyzing the results, investigate the occasional spikes.
* E. The established baseline should include the counter values you would
expect to see when the system performance is satisfactory.

19. Which HP tool enables the detection of a saturated disk subsystem as a bottleneck in a database server?
A. Array Configuration Utility (ACU)
* B. Performance Management Pack (PMP)
C. Windows Task Manager (WTM)
D. Workload Management Pack (WMP)

20. What is the Linux command to determine available memory on a RedHat
Advanced Server 3.0? A. cat /proc/info
* B. cat /proc/meminfo
C. cat /proc/memsys
D. cat /proc/memsys

21. Which technology enables building a multiserver solution that requires a centrally managed, highly available, scalable storage infrastructure?
A. Distributed File System (DFS)
* B. Storage Area Network (SAN)
C. Network File System (NFS)
D. Direct Attached Storage (DAS)

16 Rev. 4.21

Enterprise Integration and Management of HP ProLiant Servers (HPO-725)

22. Which solution would be the best protection to keep a business from extended
downtime and data loss should a catastrophic event occur? A. mirroring the data using hardware RAID 1
B.duplexing the data using a second SCSI controller
* C.remotely replicating the data across a SAN or WAN to a second site
Dstoring backup tapes at a remote site.

23. Which components should be configured as part of a fully redundant solution using an MSA1000? Select THREE.
* A. Secure Path
B. Virtual Replicator
* C. A second controller
D. A second power supply
E. An environmental monitoring unit
* F. Fibre Channel I/O module

24. Which components are required when designing a highly available HP
ProLiant server solution running Windows 2000 Advanced Server and using a
SAN-based shared storage? Select THREE. A. storage provisioning software
B. Storage Management Appliance
C. Fabric Watch software
* D. a redundant fabric infrastructure
* E. multiple Fibre Channel ports per server
F. disaster recovery software
* G. multipath software

25. A key capability of the ENSA extended architecture is defined as _______. A. partitioning of storage
B. storage security
* C. replication of storage
D. manual-configuration of new storage

26. How does a cluster configuration achieve high availability?
* A. by managing and tolerating failures of separate components
B. by allowing a failed card to be replaced without having to quiesce applications
C. by enabling the server to continue to receive power even if one power
supply should fail
D. by preventing single-bit memory errors from propagating into double-bit memory failures

27. What is the function of a dual ceiling plenum design in a datacenter?
* A. to force cold air from the ceiling
B. to force hot air through the floor
C. to remove more hot air through the ceiling
D. to reduce the number of Air Condition units

Rev. 4.21 17

Enterprise Integration and Management of HP ProLiant Servers (HPO-725)

28. What is the proper direction of forced airflow for ProLiant Server rack
configurations?
* A. Cool air is drawn through the front door and warm air is expelled through the rear door.
B. Cool air is drawn through the rear door and warm air is expelled through
the front door.
C. Cool air is drawn through the top of the rack and warm air is expelled through the bottom of the rack.
D. Cool air is drawn through the bottom of the rack and warm air is expelled
through the top of the rack.

29. How should rows of racks within a datacenter be positioned?
A. front to back to equalize temperatures throughout the data center
* B. back to back and front to front to provide alternating rows of warm and cool air
C. toward the center of the data center to provide adequate heat dissipation
from centralized AC systems
D. toward the outside of the data center to provide adequate heat dissipation for centralized AC systems

30. How does Super DLT technology help to significantly reduce administrative cost in a backup solution designed for unattended backups?
A. It has the high capacity and reliability of DLT drives to back up servers up to 50GB without compression with greater data transfer rates than the 35/70GB DLT drive. Super DLT drives are an attractive upgrade
from high-end DAT drives and a good alternative to DLT for lower-cost solutions.
B. It uses simultaneous multichannel and multihead read/write technology
to achieve capacities up to 40GB without compression.
C. It is the appropriate choice for servers with 4GB to 20GB capacity without compression.
* D. It offers backward-compatibility with DLT tapes and increases storage
capacity and data transfer rates by an order of magnitude; storage capacity starts at 110GB without compression.

31. What information is required to determine if a backup solution can perform a data backup within a specific time-span? Select THREE.
* A. The specifications of the HP tape technology being considered for the solution
B. The total number of tapes required for the backup
* C. The total amount of data to be backed up
D. The total number of tape drives required for the backup
* E. The time frame of the backup window
F. The tape backup software that will be used

32. Double-conversion (“oonline rapidshare 4shared links”) UPS technology is based on converting
_______.
* A. Incoming AC power to battery DC power to conditioned outgoing AC
power
B. Apparent power (VA) to true power (W) and back again
C. Incoming 440/480VAC to 220/240VAC for servers and 110/120VAC for workstations
D. Automotive 12VDC to 110/120VAC for a laptop.

18 Rev. 4.21

Enterprise Integration and Management of HP ProLiant Servers (HPO-725)

33. How many steps does the HP troubleshooting methodology consists of?
A. 5
* B .6
C .8
D. 12

The Hp exams leader among the providers of hp0-725 preparatory materials is Pass4sure products such as hp0-725 Braindumps, hp0-725 Study Guides, Tutorial,Torrent, hp0-725 Exam Questions with Answers, hp0-725 Trainings , hp0-725 Oonline rapidshare 4shared links Course and free PDF. It obtained its leadership and trust of the users from the very beginning of its work on the Pass4sure hp0-725 training materials market. All the hp0-725 braindumps aids have been created by people who are personally familiar with hp0-725 exams and who know all the difficulties and popular mistakes made by those who take a hp0-725 test. The entire material is logically composed in such a way that everything becomes easy to understand for anyone. Many hp0-725 guides include audio and video material. It is really easy to acquire Pass4sure hp0-725 exams becausу of great variety of methods of payment.

Recommended Training about Pass4sure HP hp0-725 exam PDF vce
The following courses are the recommended training for hp0-725 exam PDF.
hp hp0-725 Q & A with Explanations
hp hp0-725 Audio Exam
hp hp0-725 study guide
hp hp0-725 Preparation Lab
hp hp0-725 rapidshare 4shared links
hp hp0-725 books

Free down:pass4sure hp0-725
Free down:Pass4sure hp0-725

Rev. 4.21 19
http://www.hpexams.com/dumps/exam/HP0-725.rar

free braindumps
HP Free Downloads

Type

Exam Bible New Questions & Answers

Latest Updated

Available links
Testking torrent All HP's Exam Pack

226

1 days ago Download
free actualtest hp braindumps

Free Dowload PassGuide HP Certification Braindumps

  1. Free Pass4sure HP Certification Certification Exams Download
  2. Free Testking HP Certifications Download
  3. Free HP0-216 Download
  4. Free Testking HP HP0-797 Download
  5. Free Pass4sure Hp Certification HP0-j21 Download
  6. Free passguide hp2-e24 pdf Download
  7. Free Pass4sure HP ASE Certification Exams Download
  8. Free Pass4sure HP ASE HP0-725 2.97 Download
  9. Free HP ProLiant/HP BladeSystem, Insight Control Suite (ICE) and VDI/Thin Client Training Download
  10. Free Pass4sure HP Certifications Exams Download
Categories: HP ASE Tags:
certbible.org
Visited 784 times, 1 so far today
  1. No comments yet.
  1. No trackbacks yet.